Year
2020 - on going
Brasil
Heavy plates, merchant bars, metal structures, welded and seamless pipes
The Buzios overall production system foresees the interconnection of 15 wells to the Floating Production Storage and Offloading unit.
The scope of work includes five production and five injection risers and flowlines for a total length of 59 km, a 16 km-long gas export line to be connected to an existing pipeline, 11 rigid jumpers and 21 foundation subsea structures (risers and PLETs).
Tuxor supplied heavy plates and steel structures for the first phase and is supplying welded and seamless pipes for subsea applications for the second phase.